Wild Poppy Engineering Architecture Retrospective · June 2026
Window 2026-06-01 → 2026-06-30 AEST
Generated 2026-06-30
Issues 309 across 3 projects
Interactive edition · agent-generated
Retrospective · June 2026 · For the Chief Architect & CEO

The enterprise graph is now reconstructable point-in-time from Jira alone.

June's defining movement was the four-register A-box relocation formalised under ADR-WPE-013, establishing the Register-of-Record model: T-box (rules and ontology) lives in skills, A-box (instance facts) lives in Jira, Perplexity Computer orchestrates. The Gap (WPE-38), ADR (WPE-52), Building-Block (WPE-74) and LGM (WPE-75) registers and their mirror Sub-tasks were instantiated in Jira in a single sprint, lifting WPE from 26 → 88 (+62). ICN reached 78 (+17). ICA reached 143 (+27) — see the correction note below. The node:* → abb:/sbb: namespace rename (ADR-WPE-010 / NML-008) was completed concurrently. June's second movement was the capital-focus Jira-IA delta + ICN backlog clear-out: two new enterprise-wide terminal statuses — Archived (10039) and Active (10040), both in the Done category — were published across WPE, ICN and ICA, and the ICN slice was re-baselined (20 Archived, 5 Active, 7 Done). ICN open backlog collapsed 57 → 27; ICN Done-cumulative jumped 19 → 50. Across three projects 105 issues were created and 82 resolved, lifting the board to 309 total (WPE 88 · ICN 78 · ICA 143) with 174 Done-category and 131 in Backlog.

Material Correction — ICA aggregate
The initial 2026-06-29 run reported ICA 116 → 100 (−16) as a NEEDS-JUDGEMENT anomaly. That was a page-1 pagination artefact: the Jira CSV export was capped at 100 issues. Fresh key-range queries confirmed ICA was 138 contiguous issues at the 2026-06-29 baseline. The June capital-focus batch then added five tickets (ICA-139..143), so ICA closes June at 143 issues, contiguous ICA-1..143, none missing. Corrected aggregate is +27. All three projects have no gone keys.
ICN · Newsletter
78
issues · 50 Done-cat (25 Done / 20 Archived / 5 Active) · 27 Backlog · 1 In Progress
ICA · Automation
143
issues · 111 Done · 32 Backlog · 28 resolved in June · 26 created · 7 bugs
WPE · Enterprise
88
issues · 13 Done · 72 Backlog · 3 Selected · 62 created (A-box registers)
Open Gaps
8
structured open · 9 closed · 17 total in WPE-38
ADRs registered
25
WPE-001..015 · ICA-001..009 · ICN-001 · 3 drift items
Overdue roll-ups
2
WPE-25 (May) · WPE-18 (April) — both Backlog, never closed
What June materially changed
Five movements that altered the architectural posture.
  • The Register-of-Record model was formalised (ADR-WPE-013). The four-register A-box relocation — Gap (WPE-38), ADR (WPE-52), Building-Block (WPE-74), LGM (WPE-75) — and their ~23 mirror Sub-tasks were instantiated in Jira in a single sprint. The enterprise graph is now reconstructable point-in-time from Jira alone: T-box rules live in skills, A-box instance facts live in Jira, Perplexity Computer orchestrates. This drove the +62 WPE net movement and is the architectural inflexion point of the month.
  • The node namespace was migrated to abb:/sbb:. ADR-WPE-010 / NML-008 completed the node:* → abb:/sbb: rename across the board: node:editorial-pipeline → abb:editorial-pipeline, node:voice-profile → abb:voice-profile, node:email-beehiiv → sbb:beehiiv-email-channel, node:website-vercel → sbb:vercel-website, and 31 further label forward-migrations queued as auto-fixable. The top loaded node is now abb:automation-audit-persona at 33 references.
  • Five ICN gaps were closed. The ICN gap register absorbed structured closures (gap:ICN-A-C-001/002/007/008/016), reflecting ICN content-pipeline and site-architecture items resolved during the cycle. The register now has 8 open and 9 closed structured gaps across both ICN and WPE prefixes, with the UPPERCASE carve-out ratification as the standing needs-judgement item.
  • The reconciliation surface was mapped (31 auto-fixable + 1 needs-judgement). Legacy gap-label forward-migrations and node:* → abb:/sbb: retirements total 31 items that are safe to apply in foreground. The one needs-judgement item: 23 structured gap labels in WPE-38 use UPPERCASE GROUP/LAYER/STATUS (e.g. gap:ICN-A-O-016), conflicting with namespace-registry s.60 blanket-lowercase. Action required: ratify the uppercase carve-out or re-case the register.
  • Three new ADRs were registered, with three registry-body drifts surfaced. ADR-ICA-008 (mirror WPE-77, weekly free-session pool), ADR-ICA-009 (mirror WPE-80, A/B Product Test Register), and ADR-WPE-015 (mirror WPE-86, offload Jira CRUD compute to hosted MCP) exist as mirror Sub-tasks under WPE-52 but are absent from the WPE-52 registry body. Action: add to body and re-render. Eight ADRs remain pending Drive URL upload.
Decisions requiring a CEO / Chief-Architect signature in July
Choices that need formal closure before the July cycle.
  1. Ratify the UPPERCASE gap-grammar carve-out (or re-case the register). 23 structured gap labels in WPE-38 use UPPERCASE GROUP/LAYER/STATUS under s.70 structured-gap grammar, conflicting with s.60 blanket-lowercase. This is the sole NEEDS-JUDGEMENT reconciliation item — live labels are frozen until ratified.
  2. Close the three registry-body drifts. Add ADR-ICA-008, ADR-ICA-009, and ADR-WPE-015 to the WPE-52 registry body and re-render. Mirror Sub-tasks exist; the body itself is stale (last rebuilt 2026-06-24, stops at WPE-014 / ICA-007).
  3. Upload the 8 pending ADR Drive URLs. The governance record is incomplete until Drive links are resolved for each outstanding ADR. Block on July retrospective close.
  4. Close the overdue roll-ups: WPE-25 and WPE-18. The May 2026 enterprise roll-up (WPE-25) and the April 2026 roll-up (WPE-18) are both still Backlog. Two overdue cadence items is the highest governance risk entering July.
  5. Activate the 31 auto-fixable reconciliation items. Legacy gap-label forward-migrations and node:* → abb:/sbb: retirements are safe to apply in foreground. Schedule a foreground reconciliation pass before the July retrospective.
  6. Progress LGM-001 to Active. LGM-001 (ICA Waitlist Tier, WPE-75) is DRAFT; economics are UNKNOWN and the activation gate has not been tripped. Determine whether the waitlist tier economics are viable before July.
Where to focus capital and attention in July
Top action per product; full backlogs in the per-product tabs.
ICA · highest leverage
First revenue transaction from the live funnel

The audit funnel at audit.innovationcommons.xyz is live with Stripe $49 checkout wired. ICA's 111 Done items represent a completed build. Driving the first paid transaction is the primary July objective — the funnel is built; the constraint is now distribution and conversion, not architecture.

ICN · highest leverage
Apply the 31 auto-fixable label reconciliations

Legacy gap-label forward-migrations and node:* → abb: retirements are queued as auto-fixable. Clearing these cleans the ICN label register ahead of the next structured gap review, and removes the noise that obscures genuine open gaps.

WPE · highest leverage
An LLM-maintained, continuously-accurate enterprise gap register

Ensure LLMs can continually maintain an accurate gap register of the evolving enterprise. Gaps are registered relative to the gap register, which fills when target architectures fail to meet enterprise goals / growth expectations relative to baseline architectures. That comparison must itself become an automatic delta-report and reconciliation process — not a manual monthly pass. This requires a more tightly maintained Enterprise Continuum, an explicit value-chain definition, and granular capability maps built off a standardised enterprise ontology, so an LLM has the structured baseline-vs-target substrate needed to detect and register gaps autonomously.

Cross-Product View · WPE roll-up · June 2026

The Register-of-Record model makes the enterprise topology legible.

June's cross-product story is not a product sprint — it is an architecture governance sprint. ADR-WPE-013 ratified the Register-of-Record model: Jira is now the single point of truth for A-box instance facts across all four registers. Coupling check: NO VIOLATIONS on abb:leads-* (LGM-001 correctly DRAFT; activation gate not tripped; economics UNKNOWN). WPE-25 and WPE-18 are flagged as overdue cadence items.

June delivery in one frame
ProductIssuesCreatedResolvedBacklogLargest delta
ICN78174127Capital-focus clear-out: 20 Archived, 5 Active, 7 Done; backlog 57→27; Done-cum 19→50
ICA143262832First two paying customers (ICA-139); 5 new capital-focus tickets (ICA-139..143); ADR-ICA-008/009 registered
WPE88621372A-box relocation: WPE-38 (Gaps), WPE-52 (ADRs), WPE-74 (BBs), WPE-75 (LGMs) + ~23 mirror Sub-tasks; ADR-WPE-013 ratified; NML-008 completed

Where the products converge

Convergence · 1
Jira as the single Register-of-Record

ADR-WPE-013 makes Jira the canonical A-box: all four registers (Gap, ADR, Building Block, LGM) are now Jira issues with mirror Sub-tasks. Both ICN and ICA work is visible in the same topology. The enterprise graph is reconstructable at any snapshot from Jira alone — no external spreadsheet or document is authoritative.

ADR-WPE-013WPE-38/52/74/75
Convergence · 2
abb:/sbb: namespace is now the enterprise standard

The node:* → abb:/sbb: rename (ADR-WPE-010 / NML-008) applies across all three products. abb: prefixes ABBs (Architecture Building Blocks); sbb: prefixes SBBs (Solution Building Blocks). 31 auto-fixable forward-migrations are queued — schedule a foreground pass.

ADR-WPE-010NML-008
Convergence · 3
Lead generation continuum coupling — no violations

abb:leads-* coupling check: WPE-22 is Done and retired per ROR s.8A (ADR-WPE-003 superseded by WPE-58); WPE-58 and WPE-75 (register-index ticket, exempt) are the only active carriers. LGM-001 correctly DRAFT; activation gate not tripped; economics UNKNOWN. No violations.

WPE-22 DoneWPE-58LGM-001 DRAFT
Convergence · 4
Retrospective cadence — two overdue carries flagged

The three-ticket June retrospective (ICN-77, ICA-138, WPE-88) was created on cadence per ADR-WPE-004. However, WPE-25 (May 2026 enterprise roll-up) and WPE-18 (April 2026) remain Backlog and were never closed. Two overdue roll-ups is the highest governance risk entering July.

WPE-25 OVERDUEWPE-18 OVERDUE
Convergence · 5
Building-Block register instantiated (WPE-74)

~40 ABBs and ~16 SBBs including abb:ads-schema are now registered under WPE-74. Ledger NML→010. This is the first snapshot at which the building-block catalogue is a first-class Jira artefact with its own ledger, not an external document.

WPE-74NML→010

Where the products diverge (and should stay divergent)

Divergence
LLM execution layers are product-local

ICA runs Claude 4.7 / OpenRouter; ICN runs the Perplexity family for NM1000. The sbb:model-perplexity-sonar node (20 refs) is the highest-load model node. Do not force a single enterprise model vendor.

Divergence
Pricing models are product-local

ICN tiers (Ledger free / Compass $39 / Cabinet $249) and ICA's $49 founding audit price are scoped correctly to their own funnels. Do not roll into an enterprise pricing strategy yet.

Divergence
Gap registers are product-prefixed but enterprise-owned

Structured gaps use product prefixes (ICN-*, WPE-*) within WPE-38. Only WPE-prefixed gaps are enterprise-wide; ICN-prefixed gaps are product-scoped within the enterprise register.

Enterprise Continuum & Metamodel · June 2026

Where every issue lives across continuum-level × TOGAF layer.

The continuum runs strategic → segment → capability. The TOGAF layers run business → application → data → technology. Every June issue carries both labels, making this matrix queryable in real time. The peak cell is capability × application = 111, reflecting ICA's completed build sprint. Continuum ring totals: strategic 47, segment 51, capability 177, UNSET 28. TOGAF layer totals: business 140, application 147, data 34, technology 79, UNSET 34. Click a cell to see the issues in it.

Metamodel — share of issues per axis

Architecture node load
Top 16 nodes by issues referencing them. The board's centre of gravity sits on the automation-audit persona (33 refs) and the Cloudflare substrate (27 refs), consistent with prior months.
Architecture node movement
Nodes whose namespace or definition changed in June (NML-008 rename, ADR-WPE-010).
NodePreviousCurrentTickets
abb:automation-audit-personanode:automation-audit-personaRenamed to abb: prefix under NML-008; highest-load node on the board (33 refs)WPE-88
sbb:cloudflarenode:cloudflare-techRenamed to sbb:cloudflare (Solution Building Block); 27 refs enterprise-wideWPE-88
abb:editorial-pipelinenode:editorial-pipelineRenamed to abb: prefix; 8 refsWPE-88
sbb:beehiiv-email-channelnode:email-beehiivRenamed to sbb: prefix; 13 refsWPE-88
sbb:vercel-websitenode:website-vercelRenamed to sbb: prefix; 12 refsWPE-88
sbb:model-perplexity-sonarnode:model-perplexity-sonar-APIRenamed to sbb: prefix; 20 refs — highest-load model nodeWPE-88
Gap Register · June 2026

17 structured gaps in WPE-38 · 8 open, 9 closed · 1 needs-judgement item.

June completed the first full structured-gap formalisation pass. WPE-38 (Gap register, Ledger GML→014) holds 17 structured gaps in UPPERCASE canonical format. The live gap list is computed from the gap: labels every issue carries; the structured gaps use gap:ICN-*/gap:WPE-* prefixes per s.70 grammar. Legacy gap labels are frozen and forward-forbidden — they are kept for historical continuity only.

Structured gaps · Open
8
across ICN + WPE prefixes in WPE-38
Structured gaps · Closed
9
closed this cycle or prior; 5 closed in June
Reconciliation · auto-fixable
31
label forward-migrations + node:* retirements
Needs judgement
1
UPPERCASE carve-out vs s.60 blanket-lowercase

Canonical structured gaps (active in register)

Legacy gap labels (frozen — forward-forbidden)

Decision — gap hygiene actions for July

  • Ratify the UPPERCASE carve-out (or re-case). 23 structured gap labels use UPPERCASE GROUP/LAYER/STATUS per s.70 grammar (gap:ICN-A-O-016 etc.), conflicting with s.60 blanket-lowercase. This is the sole NEEDS-JUDGEMENT item. Ratify the carve-out so s.70 trumps s.60 for the structured-gap namespace, or re-case all 23 labels. Live labels frozen until ratified.
  • Apply the 31 auto-fixable forward-migrations. Legacy gap-label forward-migrations (e.g. gap:no-visual-qa → gap:ICN-A-O-005) and node:* → abb:/sbb: retirements are safe to apply in foreground without review. Schedule a foreground pass before the July retrospective.
  • Open a WPE-prefixed gap for the LGM-001 economics unknown state. LGM-001 is DRAFT with UNKNOWN economics and an untripped activation gate. If this persists to July, it qualifies as a business-architecture gap under WPE scope.
Dynamic System Architecture · Capability-level dependency map · June 2026

Logical dependencies across the Enterprise Continuum.

Each tile is an architecture capability — the highest level of definition the continuum tracks at this snapshot. Capabilities are organised into TOGAF-aligned domain swimlanes, owned by ICN (gold), ICA (blue), WPE (green), or shared across products (warm gold). Lines are logical dependencies — runtime, data, or control couplings. Gold lines cross product boundaries; dashed green lines are governance / ADR couplings; dashed gold lines are planned. Click a tile to inspect its dependencies, downstream effects, owning Jira issues, and ADR linkage. Top nodes at this snapshot: abb:automation-audit-persona (33), sbb:cloudflare (27), sbb:model-perplexity-sonar (20), abb:nm1000-pipeline (13), sbb:beehiiv-email-channel (13).

ICN owned ICA owned WPE owned Shared / cross-product
Active Planned
Intra-product dependency Cross-product dependency Governance / ADR Planned coupling
Concentration risk — June snapshot

sbb:cloudflare remains the highest-load non-persona node at 27 references, carrying the audit's Pages + Workers + D1 + Access stack and ICN's DNS/email footprint, with no enterprise technology-portfolio catalogue (gap:ICN-T-O-013, pending foreground migration). The abb:automation-audit-persona at 33 references is the single-point concentration risk on the revenue side — the entire ICA funnel is built around one persona definition. Register governance via WPE-38 now provides a formal mechanism to track and close these concentration risks as structured gaps. The abb:leads-* coupling check returned NO VIOLATIONS — LGM-001 is correctly DRAFT and the activation gate has not been tripped.

Innovation Commons Newsletter · Product retrospective · June 2026

A capital-focus re-baseline: backlog cleared, live components made Active.

June's capital-focus pass re-baselined the ICN newsletter slice: 20 issues Archived (backlog clear-out), 5 live technology-platform components set Active (ICN-25..30 — Beehiiv, Vercel, GitHub, Cloudflare DNS, Perplexity Computer), and 7 marked Done. ICN open backlog collapsed 57 → 27; Done-cumulative jumped 19 → 50 across the new Done-category statuses. 17 issues created, 41 resolved — net +17, reaching 78 total. ICN-16 remains the sole In Progress issue. The node namespace migration (node:* → abb:/sbb:) was completed; 31 legacy label forward-migrations remain queued as auto-fixable for July. Caveat: Active sits in the Done category, so the five live components count toward velocity on dashboards — add a filter excluding status = Active for true throughput.

Companion ticket: ICN-77 · Delta report: Delta-Report-2026-06.md · CSV: 2026-06-icn-jira-export.csv

July actions · ICN
  1. Apply the 31 auto-fixable label forward-migrations. Legacy gap labels (e.g. gap:no-visual-qa → gap:ICN-A-O-005) and node:* → abb: retirements are queued as safe foreground items. Clearing these removes noise from the label register before the next structured gap review.
  2. Progress ICN-16 (In Progress). ICN-16 is the sole In Progress issue at this snapshot. Advance to Done or return to Backlog to keep the two-state model clean.
  3. Ratify or close gap:ICN-A-O-004 (social pipeline). Social distribution remains structurally unconnected to NM1000 outputs. Decide whether this is a July build item or remains a registered open gap with no near-term action.
  4. Assess the Beehiiv free-plan ceiling. The Compass paid tier remains planned but unlaunchable without resolving the sync reliability and plan ceiling. Scope the Beehiiv upgrade before it blocks delivery growth.
  5. Maintain the deep-dive cadence. ICN-16 and the audience-segment register drive the higher-leverage policy-maker and capital-allocator readership. Sustaining cadence is the primary ICN growth lever.
  6. Confirm ICN-77 is worked and closed. The June retrospective ticket must be progressed and the roll-up closed before the July cycle per ADR-WPE-004.
All June issues — ICN
78 issues · grouped by epic · search and filter below
Innovation Commons Automation · Product retrospective · June 2026

First two paying customers land; the funnel converts.

ICA reached 143 issues (+27) with 26 created and 28 resolved in June — 111 Done cumulative, 32 in Backlog, 7 bugs cumulative. The June capital-focus batch added five tickets (ICA-139..143): the celebration ticket recording the first two paying customers with ads in development, product tweaks from the run-through, ad harmonisation plus a $1k experiment, a Higgsfield static-ad portfolio, and liveness automation across Facebook and Instagram. Fresh key-range queries confirmed ICA-1..143 are contiguous with no missing keys. ADR-ICA-008 (weekly free-session pool & paid-session, WPE-77) and ADR-ICA-009 (A/B Product Test Register, WPE-80) were registered this cycle.

Companion ticket: ICA-138 · Delta report: Delta-Report-2026-06.md · CSV: 2026-06-ica-jira-export.csv

July actions · ICA
  1. Drive the first paid transaction. The Stripe $49 checkout is wired and live. The funnel is built. First revenue is the primary July objective for ICA — the constraint is now distribution and conversion, not architecture.
  2. Harden ADR-ICA-008 (weekly free-session pool). Registered under WPE-77 this cycle. The free-session pool is an activation surface for the paid funnel; confirm the mechanics are production-ready before launch.
  3. Implement ADR-ICA-009 (A/B Product Test Register). Registered under WPE-80. Formalise the A/B test framework before running conversion experiments on the live funnel.
  4. Reduce the 32-issue backlog systematically. ICA has 111 Done and 32 Backlog (including the five new capital-focus tickets ICA-139..143). Work through the backlog in priority order — the highest-priority items concern ad harmonisation, the $1k experiment, and conversion quality.
  5. Confirm ICA-138 is worked and closed. The June retrospective ticket must be progressed and the roll-up closed before the July cycle per ADR-WPE-004.
  6. Resolve the 7 cumulative bugs. 7 bugs have accumulated — review and close or accept each before the first paid transaction so defects do not surface at the point of sale.
All June issues — ICA
143 issues · grouped by epic
Wild Poppy Engineering · Enterprise retrospective · June 2026

The A-box registers went live in Jira; the enterprise graph is now reconstructable.

88 issues across WPE — up from 26 (+62). June's enterprise work was entirely about the Register-of-Record model: ADR-WPE-013 was ratified, and the four A-box registers (WPE-38 Gaps, WPE-52 ADRs, WPE-74 Building Blocks, WPE-75 LGMs) and their ~23 mirror Sub-tasks were instantiated in Jira in a single sprint. The node:* → abb:/sbb: namespace rename (ADR-WPE-010 / NML-008) was completed concurrently. Coupling check on abb:leads-*: NO VIOLATIONS. Open governance risk: WPE-25 (May roll-up) and WPE-18 (April roll-up) remain Backlog.

Companion ticket: WPE-88 · Delta report: Delta-Report-2026-06.md · CSV: 2026-06-wpe-jira-export.csv

July actions · WPE
  1. Close WPE-25 (May roll-up) and WPE-18 (April roll-up). Both remain Backlog and are overdue. Two open cadence items entering a third cycle is the highest governance risk. Close WPE-25 first, then WPE-18, before the July retrospective is created.
  2. Add the three registry-body drifts to WPE-52 and re-render. ADR-ICA-008 (WPE-77), ADR-ICA-009 (WPE-80), and ADR-WPE-015 (WPE-86) exist as mirror Sub-tasks but are absent from the WPE-52 registry body. Last body rebuild was 2026-06-24; it stops at WPE-014 / ICA-007.
  3. Upload the 8 pending ADR Drive URLs. The governance record is incomplete until all ADR Drive links are resolved. Block on July retrospective close.
  4. Ratify the UPPERCASE gap-grammar carve-out. 23 structured gap labels use UPPERCASE GROUP/LAYER/STATUS (e.g. gap:ICN-A-O-016). Ratify s.70 trumps s.60 for this namespace, or re-case all 23 labels. The NEEDS-JUDGEMENT flag stays open until resolved.
  5. Apply the 31 auto-fixable reconciliation items in foreground. Legacy gap-label forward-migrations and node:* → abb:/sbb: retirements are safe to run without further review. Clear before the July retrospective.
  6. Advance WPE-75 (LGM-001) from DRAFT. LGM-001 is DRAFT with UNKNOWN economics and an untripped activation gate. Determine viability and either activate or close the metamodel before it becomes a stale governance artefact.
All June issues — WPE
88 issues · grouped by epic
ADRs & Decision Surfaces · June 2026

25 ADRs registered; three registry-body drifts surfaced; 8 Drive URLs pending.

The ADR registry now spans ADR-WPE-001..015, ADR-ICA-001..009, and ADR-ICN-001 — 25 decisions in total with ~23 mirror Sub-tasks under WPE-52. ADR-WPE-013 (Register-of-Record model, four-register A-box relocation) is the headline decision of the cycle. Three registry-body drifts were surfaced: ADR-ICA-008, ADR-ICA-009, and ADR-WPE-015 exist as mirror Sub-tasks under WPE-52 but are absent from the WPE-52 registry body (last rebuilt 2026-06-24, stops at WPE-014 / ICA-007). Eight ADRs remain pending Drive URL upload.

ADRs authored / advanced in June
ADRDecisionOwnerStatusRecord
ADR-WPE-013Register-of-Record model — T-box in skills, A-box in Jira, Perplexity Computer orchestrates; four-register relocationWPERatifiedWPE-88
ADR-WPE-010node:* → abb:/sbb: namespace rename (NML-008)WPERatifiedWPE-88
ADR-ICA-008Weekly free-session pool & paid-session architectureICAMirror only — body driftWPE-77
ADR-ICA-009A/B Product Test RegisterICAMirror only — body driftWPE-80
ADR-WPE-015Offload Jira CRUD compute to hosted MCP serverWPEMirror only — body driftWPE-86
Full ADR registry at June snapshot
NamespaceADRsState at end of June
ADR-WPE-NNN001..015013 ratified (Register-of-Record); 015 mirror-only (body drift); 8 pending Drive URLs; body last rebuilt 2026-06-24 (stops at WPE-014)
ADR-ICA-NNN001..009002/003 Done; 004 Accepted; 008/009 mirror-only (body drifts — absent from WPE-52 body)
ADR-ICN-NNN001ADR-ICN-001 registered; details per WPE-52 mirror
Decision surfaces triggered in June
SurfaceTriggerResolutionOwnerCaptured?
Register-of-Record modelA-box facts scattered across external docs and skills — not reconstructable point-in-timeT-box in skills; A-box in Jira; Perplexity Computer orchestrates; four registers instantiatedWPEADR-WPE-013
Node namespacenode:* prefix ambiguous between ABB and SBBabb: for ABBs; sbb: for SBBs; NML-008 migration completedWPEADR-WPE-010 / NML-008
Gap-grammar casing23 structured gaps use UPPERCASE GROUP/LAYER/STATUS conflicting with s.60 blanket-lowercaseNeeds-judgement — ratify uppercase carve-out or re-case. Live labels frozen.WPENEEDS-JUDGEMENT
Free-session pool & paid sessionICA session-tier architecture undefinedADR-ICA-008 registered (WPE-77); mirror Sub-task exists; body drift to resolveICAADR-ICA-008 (drift)
A/B Product Test RegisterNo formal framework for conversion experiments on the live funnelADR-ICA-009 registered (WPE-80); mirror Sub-task exists; body drift to resolveICAADR-ICA-009 (drift)
Jira CRUD computeJira writes via Computer are slow — offload to dedicated MCP serverADR-WPE-015 registered (WPE-86); mirror Sub-task exists; body drift to resolveWPEADR-WPE-015 (drift)
ADR namespace status & hygiene
NamespaceState at end of JuneJuly plan
ADR-WPE-NNN001..015 registered; WPE-013 ratified (headline); WPE-015 mirror-only drift; 8 pending Drive URLsAdd WPE-015 to body; upload all 8 pending Drive URLs; rebuild body to cover WPE-015
ADR-ICA-NNN001..009 registered; 002/003 Done; 004 Accepted; 008/009 mirror-only driftsAdd ICA-008/009 to body; re-render WPE-52; advance ICA-004 to Done with D1 schema doc
ADR-ICN-NNN001 registeredConfirm ICN-001 body entry present; upload Drive URL if pending
abb:/sbb: taxonomynode:* migration completed (NML-008); 31 legacy forward-migrations queued auto-fixableApply 31 auto-fixable forward-migrations in foreground pass
Source artefacts · June 2026

Underlying records for this retrospective.

Delta reports
  • Enterprise combined (June) — Delta-Report-2026-06.md
Jira CSV exports
  • ICN — 2026-06-icn-jira-export.csv · 78 issues
  • ICA — 2026-06-ica-jira-export.csv · 143 issues
  • WPE — 2026-06-wpe-jira-export.csv · 88 issues
Computed datasets
  • payload.json — full structured export (source for html_payload.json)
  • html_payload.json — renderer-ready dataset (inlined in this document)
Retrospective tickets (Jira)
Registers (read-only this run)
  • WPE-38 (Gap Register) — 17 structured gaps, 8 open / 9 closed, Ledger GML→014
  • WPE-52 (ADR Register) — ADR-WPE-001..015, ADR-ICA-001..009, ADR-ICN-001; ~23 mirror Sub-tasks; body last rebuilt 2026-06-24
  • WPE-74 (Building-Block Register) — ~40 ABB + ~16 SBB incl. abb:ads-schema; Ledger NML→010
  • WPE-75 (LGM Register) — LGM-001 DRAFT; economics UNKNOWN; Ledger LML→002
  • Epics — ICN-6, ICA-6, WPE-4 (parent epics for retrospective tickets)
Governance note

This run operated SURFACE-ONLY per ADR-WPE-013. Registers (WPE-38/52/74/75) were read-only. Only Jira writes were the three Retrospective tickets (ICN-77, ICA-138, WPE-88) plus append-only snapshot stamps. Window: 2026-06-01 → 2026-06-30 AEST. Prior baseline: May 2026. Counts in this report come from three CSV exports (309 issues total: WPE 88, ICN 78, ICA 143). Aggregate views — the continuum × layer heatmap, metamodel shares, node load, gap register, and the dependency map — are computed from the structured labels every issue carries: continuum-level:{strategic,segment,capability}, togaf-layer:{business,application,data,technology}, abb:<node-id> / sbb:<node-id>, and where applicable gap:<gap-id> and leads:<element>. Narrative content is derived from Delta-Report-2026-06.md. The deliverable is single-file HTML — open it offline, print it to PDF, or pin it to your governance log. Jira site: wildpoppyengineering.atlassian.net